Modular Hotel
Modular Hotel

Modern Modular Hotel Architecture

press to zoom
Modular Hotel
Modular Hotel

Modern Modular Hotel Architecture

press to zoom
Modular Hotel
Modular Hotel

Modern Modular Hotel Architecture

press to zoom
Modular Hotel
Modular Hotel

Modern Modular Hotel Architecture

press to zoom
1/10

BERGAMO,ITALY

MODULAR HOTEL

2009

This is a four star Hotel, designed to be constructed in extremely short time. The  building is a modular system where each room is a separate unit, brought to the construction site ready to be placed in the designed position. The construction of the complete hotel is estimated for 6 months. The dimensions of each room/unit can be modified according to hotel class or other requirements. The full modularity of this system is ensured by each element, even facilities have been designed as a “plug & play” solution, easy to assemble and to service. The modules are constructed on a organised and controlled production line, that ensures the advanced quality control, not possible on classic construction site. 


Designed with Studio Blast Architetti, Italy.